Peapack Solar Farm
Project Details:
Project Owner: KDC Solar, Bedminster, NJ
Project Client: The Whiting-Turner Contracting Company, Bridgewater, NJ
Project Cost: $1 million – $5 million
Project Duration: 6 months
Project Challenges:
The existing site contour and Solar Panel System utilized required that the racking be installed with tremendous accuracy and attention to detail. The presence of below grade boulders and cobbles required a significant amount of concrete foundations to be installed.
Work Performed:
- 1,800 driven posts
- Installation of Solar Racking System
Project Photo Gallery: