Phillips 66 Reinforced

Concrete Paving

Project Challenges:

  • Tight Work Area
  • Phased Construction to allow for Facility Operations
  • Truck Rack operations were 24 hours a day, requiring extensive look ahead scheduling of concrete placement

Work Performed:

  • Demolish asphalt paving
  • Prepare Subgrade
  • Rebar and Concrete

Project Details

Project Owner: Phillips66

Project Client: Phillips66

Project Cost: $1 million – $5 million

Project Duration: 8 months