Peapack Solar

Farm

Project Challenges:

The existing site contour and Solar Panel System utilized required that the racking be installed with tremendous accuracy and attention to detail. The presence of below grade boulders and cobbles required a significant amount of concrete foundations to be installed.

Work Performed:

  • 1,800 driven posts
  • Installation of Solar Racking System

Project Details

Project Owner: KDC Solar, Bedminster, NJ

Project Client: The Whiting-Turner Contracting Company, Bridgewater, NJ

Project Cost: $1 million – $5 million

Project Duration: 6 months

Project Highlights