- Demolition of the existing bridge
- Temporary reroute of the active water line to allow for new bridge construction
- Installation of cofferdam and pile supported bridge footings
- Construction of abutment walls and wing walls
- Rip Rap and Scour protection in Doctor’s Creek
- Installation of Precast Concrete Beams
- Concrete bridge deck, approach slabs, parapet walls and associated work
- Below grade drainage and water main work
- Profile Milling and paving to match existing grades