IMTT Building Foundation

and Slab

Project Challenges:

  • Active Terminal Facility
  • Coordination with Daily Operations for allowable work to be performed
  • Multiple below grade utilities altered design due to inability to shut down and reroute lines

Work Performed:

  • Excavation
  • Reinforcing Steel
  • Concrete Placement
  • Backfill and Site Restoration to Match Existing

Project Details

Project Owner: IMTT Inc.

Project Client: IMTT Inc.

Project Cost: approx. $875,000

Project Duration: 4 months

Project Highlights