Liberty State Park
Project Details:
Project Owner: State of NJ Parks
Project Client: State of NJ Parks
Project Cost: $1 million – $5 million
Project Duration: 4 months
Project Challenges:
- Timber fender demolition
- Pile driving
- Precast concrete caps and planks
- Cast in place concrete
- Timber fender
- Timber piles
Work Performed:
Demolition of existing timber pier. Drove pipe piles in 2 pile bents in a radius shape from wide to narrow. Place precast concrete pile caps and precast concrete planks. Install cast in place deck over precast. Install decorative timber fender system to match historic look. Install 100 pile timber cluster at end of pier to match historic look.