Mill Street Belleville Bridge
Project Details:
Project Owner: Franklin Development Group
Project Client: Franklin Development Group
Project Cost: $863,000
Project Duration: 4 months
Project Challenges
Simpson & Brown enlisted the services of Area Engineering to assist Franklin Development Group in a design-build effort to install a new bridge. With Geotechnical considerations and a logistically challenging site, Simpson & Brown was able to install support of excavation adjacent to an existing roadway and construct a bridge using an Integral Abutment System and Precast Concrete Beams in place of a typical deep foundation and cast-in-place abutment walls.
Work Performed:
- Support of excavation
- Additional support of Water Main
- Excavation and Grading
- Stone Reventment
- Below Grade Storm Sewer Holding System
- Integral Abutment System
- Precast Concrete Beams
- Cast-in-Place Parapet Walls and Bridge Deck